查成语>英语词典>slipway翻译和用法

slipway

英 [ˈslɪpweɪ]

美 [ˈslɪpweɪ]

n.  (造船或修船的)船台,滑台,滑道

复数:slipways 

BNC.34434 / COCA.45822

牛津词典

    noun

    • (造船或修船的)船台,滑台,滑道
      a sloping track leading down to water, on which ships are built or pulled up out of the water for repairs, or from which they are launched

      柯林斯词典

      • 船台(船只下水用的滑道)
        Aslipwayis a large platform that slopes down into the sea, from which boats are put into the water.

        英英释义

        noun

        • structure consisting of a sloping way down to the water from the place where ships are built or repaired
            Synonym:waysshipway

          双语例句

          • Based on this slipway arrangement the paper studies and analyzes the longitudinal launching technique for the. 1 718 TEU container ship.
            本文就这一船台布置方案,对1718TEU集装箱船纵向下水进行研究分析。
          • To a given ship type, friction coefficient, tide height, and the position on the slipway, the launching force should be calculated and the square equation should be solved according to the calculation method established.
            按所确定的计算方法,对给定船型、摩擦系数、潮位及船舶在滑道上的位置,进行下水外力计算和方程求解。
          • The longitudinal launching of large ships from slipway is a process incorporating complicated technology and numerous accident possibilities.
            万吨级船舶在纵向倾斜船台上下水是一个技术复杂且事故因素较多的工艺过程。
          • Dynamic Simulation Experiment of Launching of Ship ′ s Slipway
            船舶滑道下水水力动态模拟试验研究
          • At present, up to slipway longitudinally is widely used in the large or middle shipyards. There are accidents that the ship bottom structure and slipway are damaged during the process of up to slipway all over the world.
            目前船舶纵向上排是大、中型船厂广泛采用的一种上排方式,但在国内和国外的船舶上排过程中船底和船台结构时有受损的事故发生。
          • Dynamic analysis of ship launching from a semi-submerged slipway
            半潜式船台船舶下水的动力学分析
          • Construction of a Slipway with Reinforced Concrete Piles as Foundation
            钢筋混凝土桩基础滑道的施工
          • After analyzing the shortage of traditional method of time-resource optimization, this paper applies ( software P3) to the hull-block slipway assembling project. It is proved that the software is more flexible on time-resource ( optimization).
            分析传统工期-资源优化方法的不足,提出应用P3软件进行资源优化,将其运用到船台大合拢分段吊装计划管理中,证实了该软件在资源优化方法上具有一定的多样性和灵活性。
          • We adopted sliding plate and slipway to move girder body sideways without large tonnage gantry crane, and adopted windlass to drag girder, which was simple and convenient and economy.
            梁体横移不用大吨位龙门吊而采用滑板和滑道,卷扬机拖拉,简便西南交通大学硕士研究生学位论文第11页经济。
          • It decreases the self-weight of the slipway and the height of falling girder with the cast steel replacing the armor plate.
            以铸钢格构取代钢板加工式滑道,减少了滑道自重、降低了落梁高度;